Checking Design for Tung Chung Line Extension Project

Provide independent checking services on Tung Chung Line Extension Project

Project Summary

  • Provide independent checking services on Tung Chung Line Extension comprising a new Tung Chung East Station, a new Tung Chung West Station and the 820m long bored and cut & covered tunnels from the existing Tung Chung Station to the new Tung Chung West Station.
  • Check architectural, civil and structural, drainage, trackwork and the 6 selected E&M rail system designs in compliance with MTRCL's New Works Design Standards Manual, Service Requirements Document, Functional Requirements Manual and relevant Standards.
  • Ensure the designs meeting the functional and operational requirements of the TUE project, and have been accurately translated into the drawings and specifications.
  • On a risk-based approach, check the cost-effectiveness and buildability of the design of critical elements.

Project Details

Project Owner:
The Government of the HKSAR
Client:
Railway Development Office of Highways Department
Year:
Commencement: 2022 Planned Completion: TBA
Size:
(Approx)

N/A

Construction Cost:
(Approx)
Construction Cost: TBA